


Hamilton, ON
308 Parkside Drive
OVERVIEW
proposal higlightsKPMB Architects
Aspect Structural Engineers
Janet Rosenberg & Studio
Hammerschlag & Joffe
BA Consulting Group
Mulvey & Banani
MHBC Planning
Oak & Noble
Complete community living
308 Parkside Drive features 44 thoughtfully designed one-, two-, and three-bedroom rental homes, bringing sustainable, comfortable, and community-centred living to the heart of Waterdown.
Designed for the climate of the future, 308 Parkside Drive is an all-electric, high-performance development that prioritizes a reduced environmental footprint, low operating costs, and long-term resilience.
Situated in a prime location close to parks, schools, transit, and local retail, 308 Parkside Drive offers individual front and back yards in addition to beautiful shared outdoor spaces, lush gardens, and family-friendly amenities.
Proposal Highlights
44 new low-carbon rental homes
Proximity to Aldershot GO Station
Community gardens
New outdoor playground
On-site daycare
EV charging stations
project details
- The site is located near the Aldershot GO Station, with convenient access to the Greater Golden Horseshoe through the Metrolinx regional transit system.
- One, two and three-bedroom homes feature high-efficiency, all-electric heat pump mechanical systems and high-performance windows for enhanced thermal comfort and lower heating demand.
- This project features community gardens and outdoor gathering spaces with electric barbeques and picnic tables.
- Natural landscaping integrates local, resilient, drought-resistant vegetation that requires less water to maintain.
- Solar PV panels produce on-site renewable energy, reducing electricity consumption.
- No fossil fuels are combusted on site, reducing direct emissions to zero — a 100% reduction.
Timeline
Public Consultation
Q3 2022
Site Plan Submission
Q4 2022
Construction
Q3 2024
Occupancy
2025
Q2 2022
Application Submission
Q1 2023
Zoning Approval
Q2 2024
Site Approval Plan
2025
Construction Complete
News
We Want To Hear From You
Part of being a good neighbour is keeping an open dialogue. If you have comments or feedback on this development, we would be happy to listen.
Construction is due to start the week of July 29th 2024, weather dependent.